Asked by

Viridiana Fernandez
on Oct 10, 2024

verifed

Verified

What did Tantanka use as a predetermined overhead rate for fixed manufacturing overhead?

A) $85.50 per machine-hour
B) $86.64 per machine-hour
C) $87.40 per machine-hour
D) $90.00 per machine-hour

Predetermined Overhead Rate

An estimated rate used to assign overhead costs to products or services, based on a planned amount of cost and activity level.

Fixed Manufacturing Overhead

Costs that do not vary with the level of production output, such as rent and salaries of managerial staff.

  • Identify the fixed overhead rate based on an assessment of various components.
verifed

Verified Answer

YP
Yakora PittsOct 12, 2024
Final Answer:
Get Full Answer