The total job cost for Job M598 is closest to:
A) $12,270
B) $9,645
C) $3,915
D) $12,915
Job Cost
The total cost of labor, materials, and overhead assigned to a specific job or project.
- Determine the total job cost for various jobs.
Verified Answer
JP
Learning Objectives
- Determine the total job cost for various jobs.