The activity rate for the Production Orders activity cost pool under activity-based costing is closest to:

A) $176.22 per order
B) $61.79 per order
C) $172.70 per order
D) $106.87 per order

Production Orders

Instructions for manufacturing a certain number of products, detailing the materials, components, and assembly or production processes required.

Activity-Based Costing

A costing method that assigns overhead and indirect costs to specific activities based on their use or consumption.

  • Identify the rates applicable to assorted activities across multiple cost pools under the framework of activity-based costing.
verifed