Assume that the company uses a plantwide predetermined manufacturing overhead rate based on machine-hours.The amount of manufacturing overhead applied to Job A is closest to:

A) $28,512
B) $16,632
C) $11,880
D) $17,664

Plantwide Predetermined Manufacturing Overhead Rate

A single overhead rate calculated for an entire manufacturing plant, applied to all jobs or products to allocate manufacturing overhead costs.

Machine-Hours

Machine-Hours indicate the total hours that machinery is operating during a specific period of time.

Manufacturing Overhead

All indirect costs associated with the manufacturing process, such as utilities, maintenance, and management salaries.

  • Acquire knowledge on determining consistent manufacturing overhead rates throughout the facility, predicated upon machine-hour utilization.