A bill of material lists the


A) times needed to perform all phases of production.
B) production schedules for all products.
C) components,ingredients,and materials required to produce an item.
D) operations required to produce an item.
E) components,ingredients,materials,and assembly operations required to produce an item.

Correct Answer

verifed

verified

Distortion in MRP systems can be minimized when safety stock is held at the


A) purchased component or raw material level.
B) work-in-process level.
C) finished goods level.
D) A and B.
E) A and C.

Correct Answer

verifed

verified

A bill of material must be updated with the corrected dimensions of a part.The document that details this change is a(n)


A) modular bill.
B) engineering change notice.
C) resource requirements profile.
D) lead time-offset product structure document.
E) planning bill.

Correct Answer

verifed

verified

What is the "supermarket" as it is used in MRP? How does it alter the responsibility for dealing with lead-time offsets?

Correct Answer

verifed

verified

The supermarket concept applies when par...

View Answer

Describe finite capacity scheduling.How is it more realistic than MRP?

Correct Answer

verifed

verified

FCS provides the precise scheduling need...

View Answer

Which of the following is false concerning enterprise resource planning (ERP) ?


A) It attempts to automate and integrate the majority of business processes.
B) It shares common data and practices across the enterprise.
C) It is inexpensive to implement any type of off-the-shelf coding.
D) It provides and accesses information in a real-time environment.
E) It requires an ongoing implementation process.

Correct Answer

verifed

verified

Wheeled Coach insists all of the following tasks are key to successful MRP use except


A) materials plan must meet both schedule requirements and facility capabilities.
B) plan must be executed as designed.
C) inventory investment must be minimized.
D) excellent record integrity must be maintained.
E) stringent quality control.

Correct Answer

verifed

verified

If 100 units of Q are needed and 10 are already in stock,then the gross requirement is 100 and the net requirement is 90.

Correct Answer

verifed

verified

The Wagner-Whitin algorithm is the most widely used MRP lot-sizing technique.

Correct Answer

verifed

verified

Gross material requirements do not take into account the amount of inventory on hand.

Correct Answer

verifed

verified

How can MRP and JIT be effectively integrated?

Correct Answer

verifed

verified

One approach is the small bucket approac...

View Answer

A(n)________ system is packaged business software that automates and integrates the majority of their business processes,shares common data and practices across the entire enterprise,and produces and accesses information in a real-time environment.

Correct Answer

verifed

verified

enterprise...

View Answer

Which of the following best differentiates material requirements planning (MRP) from finite capacity scheduling (FCS) ?


A) FCS recognizes the finite nature of capacity while MRP does not.
B) FCS works in services while MRP does not.
C) MRP requires time buckets while FCS does not.
D) FCS is an input into traditional MRP systems.
E) FCS uses the Wagner-Whitin algorithm while MRP uses lot-for-lot and EOQ.

Correct Answer

verifed

verified

________ is a system that allows,with MRP in place,inventory data to be augmented by other resource variables.

Correct Answer

verifed

verified

Material requirement...

View Answer

Given the following bill of material Given the following bill of material   If the demand for product A is 50 units,what will be the gross requirement for component E? A) 50 B) 100 C) 150 D) 200 E) 300 If the demand for product A is 50 units,what will be the gross requirement for component E?


A) 50
B) 100
C) 150
D) 200
E) 300

Correct Answer

verifed

verified

The MPS calls for 50 units of Product A and 60 of B.There are currently 35 of Product B on hand.Each A requires 2 of Part C;each B requires 5 of C.There are 160 units of C available. a.Calculate the net requirements for B. b.Calculate the gross requirements for C. c.Calculate the net requirements for C.

Correct Answer

verifed

verified

(a)60 - 35 = 25; (b)...

View Answer

The MPS calls for 110 units of Product M.There are currently 30 of Product M on hand.Each M requires 4 of Component N.There are 20 units of N on hand.The net requirements for N are


A) 150.
B) 170.
C) 300.
D) 320.
E) 440.

Correct Answer

verifed

verified

What are the disadvantages of enterprise resource planning (ERP)?

Correct Answer

verifed

verified

ERP is very expensive to purchase,and ev...

View Answer

________ are the result of adjusting gross requirements for inventory on hand and scheduled receipts.

Correct Answer

verifed

verified

Net materi...

View Answer

When safety stock is deemed absolutely necessary,the usual policy is to build it into which category of the MRP logic?


A) Gross Requirements
B) Scheduled Receipts
C) Projected On Hand
D) Net Requirements
E) Planned Order Receipts

Correct Answer

verifed

verified