A production would most likely be responsible for an unfavorable variable overhead efficiency variance.

Correct Answer

verifed

verified

The San Jose Corporation uses two materials in the production of its product. The materials, G and H, have the following standards: The San Jose Corporation uses two materials in the production of its product. The materials, G and H, have the following standards:   During June, the following actual production information was provided: Material Actual Mix G 45,000 units H 30,000 units Yield 54,000 units What is the materials mix variance? A)  $18,000 (F)  B)  $18,000 (U)  C)  $22,500 (F)  D)  $22,500 (U) During June, the following actual production information was provided: Material Actual Mix G 45,000 units H 30,000 units Yield 54,000 units What is the materials mix variance?


A) $18,000 (F)
B) $18,000 (U)
C) $22,500 (F)
D) $22,500 (U)

Correct Answer

verifed

verified

If a company produces fewer units than expected, there will be


A) a favorable budget variance.
B) an unfavorable spending variance.
C) a favorable volume variance.
D) an unfavorable volume variance.

Correct Answer

verifed

verified

Which of the following equations measures the direct labor rate variance?


A) (SR × AH) - (SR × SH)
B) (AR × SH) - (SR × AH)
C) (AR × AH) - (SR × AH)
D) none of these

Correct Answer

verifed

verified

Figure 9-2 Bodacious Corporation produced 100 units of Product AA. The total standard and actual costs for materials and direct labor for the 100 units of Product AA are as follows: Materials: Standard Actual Standard: 200 pounds at $3.00 per pound $600 Actual: 220 pounds at $2.85 per pound $627 Direct labor: Standard: 400 hours at $15.00 per hour 6,000 Actual: 368 hours at $16.50 per hour 6,072 -Refer to Figure 9-2. What is the journal entry to record labor variances?


A) Work in Process 6,072 Payroll 6,072
B) Payroll 6,072 Work in Process 6,072
C) Work in Process 6,000 Labor Rate Variance 552
Labor Efficiency Variance 480
Payroll 6,072
D) Work in Process 6,000 Labor Efficiency Variance 552
Labor Rate Variance 480
Payroll 6,072

Correct Answer