A) 2
B) 3
C) 6
D) 12
Correct Answer
verified
Multiple Choice
A) to group small,loose parts together.
B) when the product is manufactured in major subassemblies.
C) for subassemblies that are immediately consumed in the next stage of production.
D) when due dates have not been calculated.
Correct Answer
verified
Multiple Choice
A) 3
B) 6
C) 12
D) 24
Correct Answer
verified
Multiple Choice
A) 270
B) 290
C) 340
D) 560
Correct Answer
verified
True/False
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) 3 periods of requirements
B) 2 periods of requirements
C) 1 period of requirements
D) 0 period of requirements
Correct Answer
verified
Multiple Choice
A) the master production schedule.
B) the product structure file.
C) the item master file.
D) the planned order report.
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) 1
B) 2
C) 3
D) 4
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) planned order releases
B) routing file
C) load profiles for each work center
D) open orders file
Correct Answer
verified
Multiple Choice
A) 40 in period 1 and 0 in period 3
B) 80 in period 2 and 60 in period 3
C) 60 in period 2 and 80 in period 3
D) 0 in period 1 and 40 in period 3
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) Lot-for-lot (L4L)
B) Periodic order quantity (POQ)
C) Economic order quantity(EOQ)
D) Multiple order quantity (MOQ)
Correct Answer
verified
True/False
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) 40 in period 1
B) 60 in period 2
C) 120 in period 3
D) 140 in Period 2
Correct Answer
verified
True/False
Correct Answer
verified
True/False
Correct Answer
verified