According to the Toyota Motor Company, waiting time is a necessary evil in production and is not classified as waste.

Correct Answer

verifed

verified

False

Toyota classified waste into seven major categories. Those categories include all of the following except


A) Motion
B) Ordering
C) Inventory
D) Waiting

Correct Answer

verifed

verified

A clean and organized work area is an important principle of lean thinking.

Correct Answer

verifed

verified

Firms use the "5S" principles to create a clean and organized work environment.

Correct Answer

verifed

verified

How does Total Productive Maintenance TPM) affect lean operating systems?

Correct Answer

verifed

verified

Total Productive Maintenance( TPM) is fo...

View Answer

Which one of the following statements is true?


A) Postponement is the process of delaying orders from suppliers because it is very difficult to order from geographically dispersed businesses.
B) General Motors supply chain is a good example of a push system.
C) Dell Computers supply chain is a good example of push system.
D) Flexibility and responsive service are top priorities compared to low cost in an efficient supply chain.

Correct Answer

verifed

verified

Total productive maintenance (TPM) seeks to do all of the following except ____.


A) Maximize equipment effectiveness
B) Create worker ownership
C) Foster continuous improvement efforts
D) Enable multiple products in small batches to be run on the same equipment

Correct Answer

verifed

verified

Contrast batching with single-piece flow.

Correct Answer

verifed

verified

Batching is the process of producing lar...

View Answer

Long lead-times and higher work-in-process is most closely related to which of Toyota's "Seven Major Waste Categories?"


A) Overproduction
B) Single-piece flow
C) Waiting time
D) Transportation

Correct Answer

verifed

verified

Quality at the source requires


A) Starting with a plan
B) Having reliable suppliers
C) Doing it right the first time
D) Having a good design

Correct Answer

verifed

verified

C

Principles of lean operating systems include all of the following except


A) Eliminate waste
B) Reduce workforce
C) Increase speed and response
D) Reduce cost

Correct Answer

verifed

verified

Hinge Manufacturing Company employs a Kanban system for a component part. The daily demand is 900 hinges. Each container has a wait time of 0.05/day, and a processing time of 0.37 days. The Container size is 60 hinges and the safety factor ( Ξ±\alpha ) is 10%. a.How many Kanban card sets should be authorized? b.What is the maximum inventory of this hinge in the system?

Correct Answer

verifed

verified

a.K = Average daily demand during lead t...

View Answer

Which of the following is not a basic principle of a lean operating system?


A) Elimination of waste
B) Batching
C) Increased speed and response
D) Improved quality

Correct Answer

verifed

verified

Which one of the following statements is true concerning Lean Six Sigma?


A) Lean principles focus on advanced statistical methods.
B) Lean principles have been developed over a sixty year plus period of time.
C) Lean principles include the 5Ss framework and practices.
D) Six Sigma and lean principles are not related -they are separate bodies of knowledge.

Correct Answer

verifed

verified

The 5Ss focus on improving waste generated by inefficient transportation.

Correct Answer

verifed

verified

The number of Kanban cards is directly proportional to the amount of work-in-process inventory.

Correct Answer

verifed

verified

JIT systems are based on the concept associated with pull systems rather than push systems.

Correct Answer

verifed

verified

Lean Six Sigma is simply the union of lean approaches with quality improvement techniques, each of which has been used independently in other applications.

Correct Answer

verifed

verified

True

Which of the following "lean" ideas is false?


A) Activities not adding value are a waste.
B) Accidents are a form of waste.
C) A pull system produces waste.
D) Overproduction is a form of waste.

Correct Answer

verifed

verified

In a Kanban system, the numerator of the formula K =[(dp + w) (1 + Ξ±\alpha ) ]/C is analogous to


A) demand during the lead time only in a fixed quantity inventory system.
B) safety stock only in a fixed period inventory system.
C) the order up-to-level (M) in a fixed period inventory system.
D) the reorder point (r) in a fixed quantity inventory system.

Correct Answer

verifed

verified

Showing 1 - 20 of 63