Explain the three categories of criteria used to evaluate job sequencing performance. For each category, provide two example measures.

Correct Answer

verifed

verified

Indirectly, appointments reduce the cost of providing a service because the service provider is idle less each workday.

Correct Answer

verifed

verified

The time needed to process a given set of jobs is called:


A) flow time.
B) ready time.
C) makespan.
D) due date.

Correct Answer

verifed

verified

A print shop has four jobs that have to be processed through their only five-color press. They usually use the first come, first served (FCFS) rule of scheduling jobs. However, the customers are waiting in the lobby for these jobs so the shop wants to minimize the average waiting time. They are going to use the shortest processing time rule to do so. Processing times for each job are as follows (assume this is the arrival order) : Job A, 30 minutes; Job B, 17 minutes; Job C, 12 minutes; and Job D, 39 minutes. -Using the first come, first served (FCFS) rule to sequence these jobs, the average waiting (flow) time is _____.


A) more than 20 but less than or equal to 30 minutes
B) more than 30 but less than or equal to 40 minutes
C) more than 40 but less than or equal to 50 minutes
D) more than 50 minutes

Correct Answer

verifed

verified

In a two-resource sequencing problem:


A) the makespan is the same for any sequence of jobs.
B) flow time is maximized.
C) the goal is to minimize makespan.
D) each job can be processed by either resource first.

Correct Answer

verifed

verified

Differentiate between scheduling and sequencing.

Correct Answer

verifed

verified

Scheduling refers to the assignment of s...

View Answer

Staff scheduling needs all of the following EXCEPT:


A) flow time estimates.
B) accurate forecasting.
C) staffing levels required by time period.
D) determining available personnel.

Correct Answer

verifed

verified

The table below includes processing times and due dates for five jobs.  Processing  Days Due  Job  Time (days)   From Today  A 1624 B 2330 C 2240 D 828 E 1018\begin{array}{|l|l|l|}\hline & \text { Processing } & \text { Days Due } \\\hline \text { Job } & \text { Time (days) } & \text { From Today } \\\hline \text { A } & 16 & 24 \\\hline \text { B } & 23 & 30 \\\hline \text { C } & 22 & 40 \\\hline \text { D } & 8 & 28 \\\hline \text { E } & 10 & 18 \\\hline\end{array} -Using the shortest processing time (SPT) rule, the average flow time for the five jobs is _____.


A) less than or equal to 10 days
B) more than 10 but less than or equal to 20 days
C) more than 20 but less than or equal to 30 days
D) more than 30 but less than or equal to 40 days

Correct Answer

verifed

verified

If the highest priority is to minimize the average job lateness, then the job sequence should begin with those jobs requiring:


A) the shortest processing time.
B) the smallest critical ratio.
C) the least remaining operations.
D) the longest processing time.

Correct Answer

verifed

verified

Gantt charts can be used to:


A) determine the appointment time interval.
B) determine how to handle overbooking for each day of the week.
C) display the two-resource sequencing solution using Johnson's Rule.
D) display minimizing maximum tardiness.

Correct Answer

verifed

verified

Since all jobs eventually get done, job sequencing has no effect on resource utilization.

Correct Answer

verifed

verified

The earliest due date (EDD) rule minimizes the maximum of jobs past due but doesn't perform well on average flow time, work-in-process (WIP) inventory, or resource utilization.

Correct Answer

verifed

verified

A restaurant needs the following number of wait staff to serve its evening guests.  Day:  M  Tu  W  Th  F  Sa  Su  Minimum Number of Wait Staff  Needed: 5214672\begin{array} { | l | l | l | l | l | l | l | l |} \hline \text { Day: } & \text { M } & \text { Tu } & \text { W } & \text { Th } & \text { F } & \text { Sa } & \text { Su } \\\hline \begin{array} { l } \text { Minimum Number of Wait Staff } \\\text { Needed: }\end{array} & 5 & 2 & 1 & 4 & 6 & 7 & 2\\\hline\end{array} How many employees are needed so that each has two consecutive days off? Construct a work schedule for these employees.

Correct Answer

verifed

verified

Seven employees are needed. The highligh...

View Answer

Which of the following is NOT a consideration when designing an appointment system?


A) Determining the appointment time interval
B) Determining the appropriate sequencing rule
C) Determining the length of each workday and the time off-duty
D) Deciding on an overbooking policy

Correct Answer

verifed

verified

The chief disadvantage of the shortest processing time (SPT) rule is:


A) it maximizes the average flow time.
B) it maximizes the number of jobs in the system.
C) long-duration jobs may have excessive completion times.
D) average job lateness and average job tardiness are excessive.

Correct Answer

verifed

verified

Give at least five examples of service organizations (and employee types) where, due to high variability in customer demand, staff-scheduling problems are prevalent.

Correct Answer

verifed

verified

The following five jobs, along with their processing time and due dates, are given below.  Processing  Days Due  Job  Time (days)   From Today  A 812 B 49 C 36 D 77 E 520\begin{array}{|l|l|l|}\hline & \text { Processing } & \text { Days Due } \\\hline \underline{\text { Job }} & \underline{\text { Time (days) }} & \text { From Today } \\\hline \text { A } & 8 & 12 \\\hline \text { B } & 4 & 9 \\\hline \text { C } & 3 & 6 \\\hline \text { D } & 7 & 7 \\\hline \text { E } & 5 & 20 \\\hline\end{array} -Using the earliest due date (EDD) rule, the average lateness for the five jobs is _____.


A) less than or equal to 5 days
B) more than 5 but less than or equal to 10 days
C) more than 10 but less than or equal to 15 days
D) more than 15 but less than or equal to 20 days

Correct Answer

verifed

verified

A movie theater requires the following minimum number of employees, each of whom is required to have two consecutive days off.  Day:  M  Tu  W  Th  F  Sa  Su  Minimum Personnel Required: 1132543\begin{array}{|l|c|c|c|c|c|c|c|}\hline \text { Day: } & \text { M } & \text { Tu } & \text { W } & \text { Th } & \text { F } & \text { Sa } & \text { Su } \\\hline \text { Minimum Personnel Required: } & 1 & 1 & 3 & 2 & 5 & 4 & 3 \\\hline\end{array} -Using staff scheduling method, the most overstaffed day is _____.


A) Friday only
B) Monday only
C) Tuesday only
D) Thursday only

Correct Answer

verifed

verified

A print shop has four jobs that have to be processed through their only five-color press. They usually use the first come, first served (FCFS) rule of scheduling jobs. However, the customers are waiting in the lobby for these jobs so the shop wants to minimize the average waiting time. They are going to use the shortest processing time rule to do so. Processing times for each job are as follows (assume this is the arrival order) : Job A, 30 minutes; Job B, 17 minutes; Job C, 12 minutes; and Job D, 39 minutes. -Using the shortest processing time (SPT) rule to sequence these jobs, the final sequence is_____, if A is the first person to arrive and D is the last.


A) A, B, C, D
B) C, B, A, D
C) C, D, B, A
D) A, B, D, C

Correct Answer

verifed

verified