Filters
Question type

Study Flashcards

A Logical model used to gather information about an existing system


A) comes only after a physical model of the existing system is created.
B) describes how a system actually works, rather than how it should work.
C) illustrates how a system functions by describing the flow of documents and computer processes.
D) illustrates what is being done, regardless of how that flow is actually accomplished.

Correct Answer

verifed

verified

Which group of professionals is responsible for planning and monitoring a project to ensure timely and cost-effective completion?


A) information systems steering committee
B) management
C) project development team
D) system analysts

Correct Answer

verifed

verified

The question of what the project should and should not accomplish is determined in what step of systems analysis?


A) feasibility study
B) initial investigation
C) systems analysis report
D) systems survey

Correct Answer

verifed

verified

An antiquated information system used by an office supply manufacturer caused customer dissatisfaction since it took two days to process a telephone order.After the system was upgraded and redesigned,the time to process a telephone order was reduced to three minutes.This is a prime example of


A) a competitive advantage.
B) a technological change.
C) an improved business process.
D) growth.

Correct Answer

verifed

verified

The system objective concerned that crucial information be produced first,and then less important items as time permits is known as


A) flexibility.
B) reliability.
C) timeliness.
D) usefulness.

Correct Answer

verifed

verified

C

Which data gathering method is most helpful to deal with the question: "Why?"


A) interviews
B) observation by the analyst
C) questionnaires
D) system documentation

Correct Answer

verifed

verified

A system change that results in an improved product or service and helps lower costs provided a(n)


A) competitive advantage.
B) improved business process.
C) productivity gain.
D) technological change.

Correct Answer

verifed

verified

Who is responsible for preparing the specifications that are used to create the programs?


A) management
B) programmers
C) systems analysts
D) the information systems steering committee

Correct Answer

verifed

verified

Refer to the diagram below,where the numbers next to the arrows refer to the number of days required for completion of the corresponding activity.What is the critical path? Refer to the diagram below,where the numbers next to the arrows refer to the number of days required for completion of the corresponding activity.What is the critical path?   A)  A-B-D-F B)  A-C-E-F C)  A-B-D-E-F D)  A-C-B-D-F E)  A-C-B-D-E-F


A) A-B-D-F
B) A-C-E-F
C) A-B-D-E-F
D) A-C-B-D-F
E) A-C-B-D-E-F

Correct Answer

verifed

verified

What is the basic model used to create a framework for economic feasibility analysis?


A) the capital budgeting model
B) the cash budgeting model
C) the cost/benefit model
D) All of the above models are used to create a framework.

Correct Answer

verifed

verified

In which phase of the systems development life cycle is the feasibility study first performed?


A) conceptual design
B) implementation and conversion
C) physical design
D) system analysis

Correct Answer

verifed

verified

The capital budgeting technique where estimated future cash flows are discounted back to the present is referred to as


A) the future value method.
B) the internal rate of return.
C) the net present value method.
D) the payback method.

Correct Answer

verifed

verified

C

Major resistance to change takes one of several forms.What is the name of the form of resistance where the new system is blamed for any and every unpleasant occurrence?


A) aggression
B) avoidance
C) procrastination
D) projection

Correct Answer

verifed

verified

A project development team at Midwest Construction was assigned the task of improving the efficiency of the firm's accounting information system.As part of the ________ step in the systems development life cycle,the team has determined that the objectives of the project can be accomplished by installing a new computer system or by upgrading the existing system.


A) systems analysis
B) implementation and conversion
C) physical design
D) conceptual design

Correct Answer

verifed

verified

The type of user resistance in which data are erroneously entered into a system is called


A) acceptance.
B) aggression.
C) avoidance.
D) projection.

Correct Answer

verifed

verified

B

There are several important aspects to be considered during a feasibility study.The aspect that asks the question,"Can people use the system and will they use it?" is called


A) economic feasibility.
B) operational feasibility.
C) scheduling feasibility.
D) technical feasibility.

Correct Answer

verifed

verified

In which systems analysis step do analysts conduct an extensive study of the present system to gain a thorough understanding of how it works?


A) feasibility study
B) information needs and requirements
C) systems analysis report
D) systems survey

Correct Answer

verifed

verified

Who makes up the project development team and what is the team's purpose?

Correct Answer

verifed

verified

The project development team includes sy...

View Answer

The ________ method of gathering information helps to determine how a system actually works.


A) interview
B) observation
C) questionnaire
D) system documentation

Correct Answer

verifed

verified

A project development team at Midwest Construction was assigned the task of improving the efficiency of the firm's accounting information system.As part of the ________ step in the systems development life cycle,the team defined the procedures to back up and secure system data.


A) operations and maintenance
B) implementation and conversion
C) physical design
D) conceptual design

Correct Answer

verifed

verified

Showing 1 - 20 of 90

Related Exams

Show Answer