An assembly-time chart indicates gross and net requirements taking into account the current available inventory.

Correct Answer

verifed

verified

False

An MRP system whose records are updated continuously is referred to as a(n) :


A) regenerative system.
B) batch-type system.
C) Plossl-Wright system.
D) net-change system.
E) gross-change system.

Correct Answer

verifed

verified

Safety time is sometimes used in MRP rather than safety stock quantities.

Correct Answer

verifed

verified

One reason that accurate bills of material are important is that errors at one level become magnified at lower levels because of the multiplication process used by MRP.

Correct Answer

verifed

verified

An MRP system that is updated periodically to account for all changes which have occurred within a given time interval is called a(n) ________ system.


A) pegging
B) planned order release
C) net-change
D) regenerative
E) exception report

Correct Answer

verifed

verified

In many organizations, information flows much more freely within functions than it does across functions. __________ represents an expanded effort to overcome this tendency.


A) MRP
B) ERP
C) CRP
D) MRPII
E) DRP

Correct Answer

verifed

verified

MRP II did not replace or improve the basic MRP.

Correct Answer

verifed

verified

True

Bunny Helpers, Inc., has just received an order for 100 Deluxe Easter Baskets, which must be ready for delivery at the start of week 6. An MRP planner has prepared the following table showing product structure, lead times (orders are lot-for-lot) , and quantities on hand:  Deluxe Easter Basket BOM  Lead Time  On-Hand  Deluxe Easter Basket 1 week 10 Dark Chocolate Truffles (2 per)  2 weeks 30 Carved Chocolate Eggs (4 per)  1 week 50\begin{array} { c l l } \text { Deluxe Easter Basket BOM } & \text { Lead Time } & \text { On-Hand } \\\hline \text { Deluxe Easter Basket } & 1 \text { week } & 10 \\\text { Dark Chocolate Truffles (2 per) } & 2 \text { weeks } & 30 \\\text { Carved Chocolate Eggs (4 per) } & 1 \text { week } & 50\end{array} Each Deluxe Basket contains two dark chocolate truffles and four carved chocolate eggs; additionally one bottle of Alka-Seltzer is included for those who overindulge. How many dark chocolate eggs should be ordered?


A) 310
B) 450
C) 500
D) 550
E) 600

Correct Answer

verifed

verified

Given the following information, develop a material requirements plan that will lead to 400 units of product P being available at the beginning of week 7. Given the following information, develop a material requirements plan that will lead to 400 units of product P being available at the beginning of week 7.

Correct Answer

verifed

verified

\[\begin{array}{l}
\text { Planned Order...

View Answer

Which statement concerning MRP II is false?


A) It is basically a computerized system.
B) It can handle complex planning and scheduling quickly.
C) It involves other functional areas in the production planning process.
D) It involves capacity planning.
E) It produces a production plan which includes all resources required.

Correct Answer

verifed

verified

An effort to expand the scope of production resource planning by involving other functional areas in the planning process has been:


A) material requirements planning.
B) capacity requirements planning.
C) manufacturing resources planning.
D) just-in-time planning.
E) multifunctional relationships planning.

Correct Answer

verifed

verified

ERP began in manufacturing organizations but has spread into service organizations.

Correct Answer

verifed

verified

True

The master schedule needs to be for a period long enough to cover the stacked or cumulative lead time necessary to produce the end items.

Correct Answer

verifed

verified

Lot-for-lot ordering in MRP provides coverage for some predetermined number of periods (such as two or three) that extend beyond the orders already received for those periods.

Correct Answer

verifed

verified

ERP's primary value comes from applications:


A) deployment.
B) development.
C) interfaces.
D) integration.
E) networking.

Correct Answer

verifed

verified

Project management approaches can help in a conversion to an ERP system.

Correct Answer

verifed

verified

The gross requirements at one level of an MRP plan determine the gross requirements at the next lower level continuing on down to the lowest levels shown on the bill of material.

Correct Answer

verifed

verified

Which of the following is a direct input into capacity requirements planning? (I) the master production schedule (II) routing information (III) current shop loads (IV) planned-order releases


A) II, III, and IV only
B) I, II, and IV only
C) I, III, and IV only
D) I and II only
E) I, II, III, and IV

Correct Answer

verifed

verified

Which of the following is absolutely necessary for successful implementation and operation of MRP? (I) accurate inventory records (II) accurate demand forecasts (III) accurate holding and backordering costs (IV) accurate bills of materials


A) I, II, and IV only
B) I, III, and IV only
C) I, II, and III only
D) I and II only
E) I, II, III, and IV

Correct Answer

verifed

verified

Which of these products would be most likely to have dependent demand?


A) refrigerators
B) automobile engines
C) televisions
D) brownies
E) automobiles

Correct Answer

verifed

verified