Filters
Question type

Study Flashcards

The ultimate goal of lean operations is a system characterized by the smooth, rapid flow of materials.

Correct Answer

verifed

verified

A benefit of small lot sizes in lean systems is that each product is produced less frequently.

Correct Answer

verifed

verified

Previously management calculated the number of kanban cards allowed by using a value of 1.3 for X.Assuming nothing else (e.g., usage rates, container capacities, etc.) which of the following values for X would indicate management's believing that the system has become more efficient?


A) 2.6
B) 2.3
C) 1.5
D) 1.4
E) 1.2

Correct Answer

verifed

verified

Which of the following would not contribute to the leaning of services?


A) improve the reliability of vendors
B) increase the flexibility of the service system
C) have service workers handle multiple tasks
D) standardize the service output
E) improve the service process

Correct Answer

verifed

verified

Lean concepts include large lots to take advantage of the economies of scale.

Correct Answer

verifed

verified

Limited WIP lowers inventory carrying costs but reduces flexibility.

Correct Answer

verifed

verified

A basic requirement for operating with the low inventories present in lean systems is:


A) Inventory space must be increased.
B) Inventory investment must be increased.
C) Major problems must be identified.
D) Major problems must have been solved.
E) Inventories must be reduced rapidly.

Correct Answer

verifed

verified

Quality and highly capable production systems are requirements for the successful implementation of lean operations.

Correct Answer

verifed

verified

When lean is used in the context of services, which of the following is most often the focus?


A) the labor content of the service
B) the time needed to perform a service
C) the inventory tied up in the service
D) the equipment used in the service
E) suppliers of inputs to the service

Correct Answer

verifed

verified

In lean operations, when work is completed at one work center, it is important to immediately move the completed work to the next work center to minimize idle time.

Correct Answer

verifed

verified

In the lean philosophy, the larger the lot size, the easier it is to schedule.

Correct Answer

verifed

verified

A successful conversion to a lean system requires that every vendor use lean approaches prior to the organization's implementation.

Correct Answer

verifed

verified

The Kaizen philosophy applies to ________.


A) Employee development
B) Safety stock
C) Waste
D) Supply Chain Management
E) MRP III

Correct Answer

verifed

verified

Which of the following would you not expect to see in a lean environment?


A) a flexible system
B) minimum inventory
C) little waste
D) reduced setup times
E) a significant number of daily schedule changes

Correct Answer

verifed

verified

The small lot-sizing policy works well in a situation where both holding costs and setup costs are high.

Correct Answer

verifed

verified

The lean philosophy suggests that workers are _________.


A) Assets
B) Liabilities
C) Interchangeable
D) Replaceable
E) To be phased out

Correct Answer

verifed

verified

A real advantage of the lean philosophy is the reduction of co-ordination effort required.

Correct Answer

verifed

verified

Engineering changes can be very disruptive to smooth operations and should not be made in the six month period following introduction of a new product.

Correct Answer

verifed

verified

The four building blocks of lean operations are: product design, process design, personnel/organizational elements, and manufacturing planning and control.

Correct Answer

verifed

verified

With regard to suppliers, lean systems typically require:


A) delivery of large lots at regular intervals
B) buyer inspection of goods and materials
C) multiple sources from which to purchase
D) long-term relationships and commitments
E) the lowest price possible

Correct Answer

verifed

verified

Showing 21 - 40 of 88

Related Exams

Show Answer