What is the part-period method lot size for the order for the first period?


A) 120
B) 200
C) 280
D) 350
E) 450

Correct Answer

verifed

verified

Which of the following most closely describes dependent demand?


A) Demand generated by suppliers.
B) Sales forecasts.
C) Derived demand.
D) Demands placed on suppliers by their customers.
E) Net material requirements.

Correct Answer

verifed

verified

C

The planned-order releases at one level of an MRP plan determine the gross requirements at the next level down in the bill of material.

Correct Answer

verifed

verified

Independent demand tends to be ___________,while dependent demand tends to be __________.


A) unstable; smooth
B) unstable; stable
C) stable; lumpy
D) smooth; sawtooth
E) sawtooth; smooth

Correct Answer

verifed

verified

The following is a list of components required to produce one unit of end item P: P: 2 A's,3 B's,3 C's A: 5 M's,2 R's B:1 D,3 N's. C: 1 T,4 N's M: 1 N Determine the number of N's that will be needed to make 60 P's in each of these cases: (i)There are currently 10 P's on hand. (ii)On-hand inventory consists of 15 P's,10A's,20 B's,10 C's,100 N's,300 T's,and 200 M's.

Correct Answer

verifed

verified

The produc...

View Answer

The master production schedule (MPS)states which end items are to be produced.

Correct Answer

verifed

verified

The bill of material contains information on lead times.

Correct Answer

verifed

verified

Budget overruns when implementing ERP systems are typically caused by: I.high equipment costs. II.high training costs. III.high capital interest charges. IV.costs of integrating and testing


A) I only
B) I and III only
C) I, II, IV only
D) II and IV only
E) I, II, and IV only

Correct Answer

verifed

verified

D

Dependent demand is derived demand.

Correct Answer

verifed

verified

The hierarchical diagram that depicts the subassemblies and components that are needed to produce and/or assemble a product is called a(n) :


A) assembly time chart.
B) product structure tree.
C) MRP II.
D) pegging.
E) none of the choices.

Correct Answer

verifed

verified

B

Which one of the following most closely describes the MRP approach that is used for components or subassemblies to compensate for variations in lead time?


A) Pegging
B) Safety stock
C) Increased order sizes
D) Safety time
E) Low-level coding

Correct Answer

verifed

verified

The gross requirements of a given part or component are determined from:


A) net requirements + amount on-hand.
B) gross requirements of the immediate parent(s) .
C) planned order releases of the end item.
D) net requirements of the end item.
E) planned order release of the immediate parent(s) .

Correct Answer

verifed

verified

MRP usually involves inventory items that have independent demand.

Correct Answer

verifed

verified

Given the following information,construct a product tree diagram and develop a material requirements plan that will yield 400 units of product P at the start of week 7. Given the following information,construct a product tree diagram and develop a material requirements plan that will yield 400 units of product P at the start of week 7.    Use the following form:   Use the following form: Given the following information,construct a product tree diagram and develop a material requirements plan that will yield 400 units of product P at the start of week 7.    Use the following form:

Correct Answer

verifed

verified

Product st...

View Answer

The development and application of MRP is primarily associated with two developments: (1) managers recognizing the need to differentiate between independent and dependent demand,and (2) ___________.


A) increased reliance on computers for record keeping
B) development of the EOQ model
C) the need for inventory control systems
D) the emergence of ERP systems
E) accounting systems

Correct Answer

verifed

verified

What is the economic part-period (EPP) for ordering this item?


A) 2
B) 50
C) 100
D) 150
E) 200

Correct Answer

verifed

verified

ERP involves software that is used to manage and coordinate all the resources,information,and functions of an organization from a shared database.

Correct Answer

verifed

verified

If 40 Ps are needed,and on-hand inventory consists of 15 Ps and 10 each of all other components and subassemblies,how many Cs are needed?


A) 340
B) 350
C) 380
D) 400
E) 590

Correct Answer

verifed

verified

The MRP requires a list of the individual parts that will be converted to finished goods.

Correct Answer

verifed

verified

One of the primary reports of MRP concerns changes to open orders.

Correct Answer

verifed

verified