_____ involves defining and documenting the features and functions of the products produced during the project as well as the processes used for creating them.


A) Collecting requirements
B) Defining scope  
C) Controlling scope
D) Validating scope

Correct Answer

verifed

verified

Scope refers to all the work involved in creating the products of the project and the processes used to create them.

Correct Answer

verifed

verified

The _____ includes the approved project scope statement and its associated WBS and WBS dictionary.

Correct Answer

verifed

verified

_____ is the tendency for project scope to keep getting bigger and bigger.

Correct Answer

verifed

verified

A(n) _____ is a deliverable-oriented grouping of the work involved in a project that defines its total scope.

Correct Answer

verifed

verified

WBS?work b...

View Answer

_____ uses highly organized and intensive workshops to bring together project stakeholders-the sponsor, users, business analysts, programmers, and so on-to jointly define and design information systems.


A) Prototyping
B) JAD  
C) RAD
D) Use case modeling

Correct Answer

verifed

verified

_____ involves formalizing acceptance of the project deliverables and during this phase the key project stakeholders, such as the customer and sponsor for the project, inspect and then formally accept the deliverables.


A) Creating scope
B) Defining scope  
C) Controlling scope
D) Validating scope

Correct Answer

verifed

verified

The WBS is organized solely around project phases.

Correct Answer

verifed

verified

_____ refers to the difference between planned and actual performance.


A) Decomposition
B) Variance  
C) Scope validation
D) Scope creep

Correct Answer

verifed

verified

Scope creep if not managed well can lead to the failure of information technology projects.

Correct Answer

verifed

verified

Generating ideas by comparing specific project practices or product characteristics to those of other projects or products inside or outside the performing organization is known as _____.


A) variance
B) benchmarking  
C) prototyping
D) decomposition

Correct Answer

verifed

verified

A work package must always represent less than 80 hours of work.

Correct Answer

verifed

verified

In the _____approach for constructing a WBS, you use a similar project's WBS as a starting point.


A) top-down
B) bottom-up  
C) mind-mapping
D) analogy

Correct Answer

verifed

verified

_____ is a process for identifying and modeling business events, who initiated them, and how the system should respond to them.

Correct Answer

verifed

verified

Mind mapping can be used for developing WBSs using


A) the analogy approach only
B) the bottom-up or analogy approach  
C) the top-down or bottom-up approach
D) any approach

Correct Answer

verifed

verified

_____ refers to the process of developing a working replica of the system or some aspect of the system.


A) Prototyping
B) Variance  
C) Decomposition
D) Use case modeling

Correct Answer

verifed

verified

The _____ should list and describe all of the deliverables required for the project.


A) project charter
B) scope statement  
C) WBS
D) Gantt chart

Correct Answer

verifed

verified

The executing tasks of the WBS remain constant from project to project.

Correct Answer

verifed

verified

The ______ documents how project needs will be analyzed, documented, and managed.


A) requirements traceability matrix
B) requirements management plan  
C) WBS
D) project scope statement

Correct Answer

verifed

verified

Deliverables are only product-related, such as a piece of hardware or software.