Which is a part of the OSHA definition of a confined space?


A) is too small to enter
B) may cause claustrophobia
C) has limited or restricted means for entry or exit
D) has nothing to do with preventative maintenance

Correct Answer

verifed

verified

It is important that another person remains at the entry point of the confined space in the event that an individual must be pulled out because of losing consciousness while in the confined space.

Correct Answer

verifed

verified

The ____ of a machine is very important when referring to preventative maintenance.


A) history
B) type
C) age
D) operators

Correct Answer

verifed

verified

It is the responsibility of the leadperson to ensure that everyone is wearing the proper PPE at all times

Correct Answer

verifed

verified

When should the PM duties for a given machine be planned?


A) Just before the PM starts
B) Right after the machine is shut down for the PM
C) Before the machine is ever shut down
D) Whenever the plant manager gives approval

Correct Answer

verifed

verified

The first thing that a PM coordinator must do is to talk to all machine operators before the machine is shut down.

Correct Answer

verifed

verified

Only one lockout/tagout is required per machine during PM.

Correct Answer

verifed

verified

Once the PM has been totally completed, the ____________________ should be retrieved from the plant engineer's office or the safety coordinator's office and brought to the machine.

Correct Answer

verifed

verified

When the PM crew arrives at the machine, what is the first thing that needs to be done?


A) Close the lockbox
B) Clean the surrounding area.
C) Set up the toolboxes.
D) Lock out all energy sources.

Correct Answer

verifed

verified

On completion of the machine survey, a list needs to be made of the things that should be ____________________ and replaced during the PM shutdown.

Correct Answer

verifed

verified

inspected

Where can the history of a machine be reviewed?


A) downtime sheet
B) operator roster
C) maintenance log
D) turnstile

Correct Answer

verifed

verified

A(n) ____________________ should be designated in the presence of those who will be working on the machine at the time of PM.

Correct Answer

verifed

verified

leadperson

While working on a PM crew, it is easy to hurry and cut corners due to time constraints.

Correct Answer

verifed

verified

Who should remove a lockout if the person who put the lockout on is not present?


A) The plant engineer
B) The safety officer
C) The leadperson
D) No one

Correct Answer

verifed

verified

While the PM coordinator is surveying the machine, it is a good idea for him or her to ____.


A) rope off the machine
B) talk to the operator(s)
C) inspect only the crucial parts of the machine
D) inform the plant engineer

Correct Answer

verifed

verified

B