A) is too small to enter
B) may cause claustrophobia
C) has limited or restricted means for entry or exit
D) has nothing to do with preventative maintenance
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) history
B) type
C) age
D) operators
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) Just before the PM starts
B) Right after the machine is shut down for the PM
C) Before the machine is ever shut down
D) Whenever the plant manager gives approval
Correct Answer
verified
True/False
Correct Answer
verified
True/False
Correct Answer
verified
Short Answer
Correct Answer
verified
Multiple Choice
A) Close the lockbox
B) Clean the surrounding area.
C) Set up the toolboxes.
D) Lock out all energy sources.
Correct Answer
verified
Short Answer
Correct Answer
verified
Multiple Choice
A) downtime sheet
B) operator roster
C) maintenance log
D) turnstile
Correct Answer
verified
Short Answer
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) The plant engineer
B) The safety officer
C) The leadperson
D) No one
Correct Answer
verified
Multiple Choice
A) rope off the machine
B) talk to the operator(s)
C) inspect only the crucial parts of the machine
D) inform the plant engineer
Correct Answer
verified