In general, job-shop systems have a lower unit cost than continuous systems do because continuous systems use costly specialized equipment.

Correct Answer

verifed

verified

Product layouts typically achieve high utilization of labor and equipment.

Correct Answer

verifed

verified

Accounting, purchasing, and inventory control are fairly routine with process layouts.

Correct Answer

verifed

verified

A production line is to be designed for a job with three tasks. The task times are 0.3 minutes, 1.4 minutes, and 0.7 minutes. For a single production line with no parallel activities, the minimum cycle time in minutes is


A) 0.3.
B) 0.7.
C) 1.4.
D) 2.4.
E) 0.8.

Correct Answer

verifed

verified

Computer-aided manufacturing refers to the use of computers in


A) product design.
B) decision making.
C) data analysis.
D) quality control.
E) process control.

Correct Answer

verifed

verified

Avoiding bottlenecks is the primary goal of product design.

Correct Answer

verifed

verified

The minimum number of workstations for a production line is determined in part by the desired output rate.

Correct Answer

verifed

verified

A common goal in designing process layouts is


A) minimizing the number of workers.
B) minimizing idle time.
C) minimizing transportation costs.
D) maximizing workstation productive time.
E) maximizing transportation distances.

Correct Answer

verifed

verified

An advantage of a U-shaped production line is that


A) it is less compact.
B) communication is reduced among employees.
C) workers are specialists.
D) work assignments are more rigid.
E) it is more efficient than a traditional product layout.

Correct Answer

verifed

verified

A company needs to locate three departments (X, Y, and Z) in the three areas (I, II, and III) of a new facility. They want to minimize interdepartmental transportation costs, which are expected to be $0.50 per load meter moved. An analyst has prepared the following flow and distance matrices: A company needs to locate three departments (X, Y, and Z) in the three areas (I, II, and III) of a new facility. They want to minimize interdepartmental transportation costs, which are expected to be $0.50 per load meter moved. An analyst has prepared the following flow and distance matrices:   If the company were to locate departments X, Y, and Z in areas I, II, and III, respectively, what would be the total distance (in meters) loads would be moved each week? A) 3,100 B) 3,600 C) 6,200 D) 6,700 E) 8,200 If the company were to locate departments X, Y, and Z in areas I, II, and III, respectively, what would be the total distance (in meters) loads would be moved each week?


A) 3,100
B) 3,600
C) 6,200
D) 6,700
E) 8,200

Correct Answer

verifed

verified

A company needs to rebalance a product layout for producing new plastic license plates. They plan to use the assembly line 6 hours in order to meet projected demand of 2,160 license plates each day. The following table describes the tasks involved in the production of this product: A company needs to rebalance a product layout for producing new plastic license plates. They plan to use the assembly line 6 hours in order to meet projected demand of 2,160 license plates each day. The following table describes the tasks involved in the production of this product:   For output to equal projected demand, what is the theoretical minimum number of workstations needed? A) 2 B) 2.8 C) 3 D) 4 E) 5 For output to equal projected demand, what is the theoretical minimum number of workstations needed?


A) 2
B) 2.8
C) 3
D) 4
E) 5

Correct Answer

verifed

verified

Information technology refers to competitive data.

Correct Answer

verifed

verified

The goal of line balancing is to assign tasks to workstations in such a way that the workstations have approximately equal time requirements.

Correct Answer

verifed

verified

A company needs to locate three departments (X, Y, and Z) in the three areas (I, II, and III) of a new facility. They want to minimize interdepartmental transportation costs, which are expected to be $0.50 per load per meter moved. An analyst has prepared the following distances and flow matrices: A company needs to locate three departments (X, Y, and Z) in the three areas (I, II, and III) of a new facility. They want to minimize interdepartmental transportation costs, which are expected to be $0.50 per load per meter moved. An analyst has prepared the following distances and flow matrices:   What are total weekly costs for the least costly process layout? A) $2,800 B) $3,150 C) $3,500 D) $4,000 E) $4,500 What are total weekly costs for the least costly process layout?


A) $2,800
B) $3,150
C) $3,500
D) $4,000
E) $4,500

Correct Answer

verifed

verified

Which of the following process types would be most likely to be used in the maturity phase of a product's life cycle?


A) repetitive
B) intermittent
C) project
D) batch
E) job shop

Correct Answer

verifed

verified

The main issue in the design of process layouts for service operations concerns the relative positioning of


A) workstations.
B) processing components.
C) departments.
D) entrances, loading docks, etc.
E) manufacturing cells.

Correct Answer

verifed

verified

Which one of the following is not considered an important factor in retail layout design?


A) cost minimization
B) traffic patterns and traffic flow
C) opportunity to influence customer attitudes
D) degree of contact with the customer
E) degree of customization

Correct Answer

verifed

verified

QRS Corp. is designing a product layout for a new product. They plan to use this production line 10 hours a day in order to meet forecasted demand of 900 units per day. The following table describes the tasks necessary to produce this product: QRS Corp. is designing a product layout for a new product. They plan to use this production line 10 hours a day in order to meet forecasted demand of 900 units per day. The following table describes the tasks necessary to produce this product:   For output to equal forecasted demand, what should be the actual cycle time for this production? A) 32 seconds B) 38 seconds C) 40 seconds D) 76 seconds E) 152 seconds For output to equal forecasted demand, what should be the actual cycle time for this production?


A) 32 seconds
B) 38 seconds
C) 40 seconds
D) 76 seconds
E) 152 seconds

Correct Answer

verifed

verified

A company needs to locate three departments (X, Y, and Z) in the three areas (I, II, and III) of a new facility. They want to minimize interdepartmental transportation costs, which are expected to be $0.50 per load per meter moved. An analyst has prepared the following distances and flow matrices: A company needs to locate three departments (X, Y, and Z) in the three areas (I, II, and III) of a new facility. They want to minimize interdepartmental transportation costs, which are expected to be $0.50 per load per meter moved. An analyst has prepared the following distances and flow matrices:   If departments X, Y, and Z were to be located in areas I, II, and III, respectively, what would be the total distance (in meters) loads would be moved each week? A) 4,000 B) 4,500 C) 7,000 D) 8,000 E) 9,000 If departments X, Y, and Z were to be located in areas I, II, and III, respectively, what would be the total distance (in meters) loads would be moved each week?


A) 4,000
B) 4,500
C) 7,000
D) 8,000
E) 9,000

Correct Answer

verifed

verified

The key questions in the process selection task are: (I) How will the product/service be priced? (II) How much variety will be imposed on the process? (III) What is the target market for the product/service? (IV) At what volume will the process need to operate?


A) I and III
B) II and IV
C) II and III
D) I and IV
E) III and IV

Correct Answer

verifed

verified

Showing 41 - 60 of 137