Pendarvis Company uses a job-order costing system and has the following information for the first week of June: Pendarvis Company uses a job-order costing system and has the following information for the first week of June:                Required:       Pendarvis Company uses a job-order costing system and has the following information for the first week of June:                Required:       Pendarvis Company uses a job-order costing system and has the following information for the first week of June:                Required:       Pendarvis Company uses a job-order costing system and has the following information for the first week of June:                Required:       Pendarvis Company uses a job-order costing system and has the following information for the first week of June:                Required:       Pendarvis Company uses a job-order costing system and has the following information for the first week of June:                Required:       Pendarvis Company uses a job-order costing system and has the following information for the first week of June:                Required:       Required: Pendarvis Company uses a job-order costing system and has the following information for the first week of June:                Required:       Pendarvis Company uses a job-order costing system and has the following information for the first week of June:                Required:       Pendarvis Company uses a job-order costing system and has the following information for the first week of June:                Required:

Correct Answer

verifed

verified

The logical explanation for an entry that includes a debit to Manufacturing Overhead control and a credit to Prepaid Insurance is


A) the insurance company sent the company a refund of its policy premium.
B) overhead for insurance was applied to production.
C) insurance for production equipment expired.
D) insurance was paid on production equipment.

Correct Answer

verifed

verified

McKinney Manufacturing Company McKinney Manufacturing Company produces beach chairs.Chair frames are all the same size,but can be made from plastic,wood,or aluminum.Regardless of frame choice,the same sailcloth is used for the seat on all chairs.McKinney has set a standard for sailcloth of $9.90 per square yard and each chair requires 1 square yard of material.McKinney produced 500 plastic chairs,100 wooden chairs,and 250 aluminum chairs during June.The total cost for 1,000 square yards of sailcloth during the month was $10,000.At the end of the month,50 square yards of sailcloth remained in inventory. Refer to McKinney Manufacturing Company.Assuming that there was no sailcloth in inventory at the beginning of June,the unfavorable material quantity variance for the month was


A) $ 495.
B) $ 500.
C) $ 990.
D) $1,000.

Correct Answer

verifed

verified

Which of the following would fall within the range of tolerance for a production cycle? Which of the following would fall within the range of tolerance for a production cycle?   A) yes yes B) yes no C) no no D) no yes


A) yes yes
B) yes no
C) no no
D) no yes

Correct Answer

verifed

verified

Webb Company. Webb Company uses a job-order costing system and the following information is available from its records.The company has three jobs in process: #6,#9,and #13. Webb Company. Webb Company uses a job-order costing system and the following information is available from its records.The company has three jobs in process: #6,#9,and #13.   Direct material was requisitioned as follows for each job respectively: 30 percent,25 percent,and 25 percent; the balance of the requisitions was considered indirect.Direct labor hours per job are 2,500; 3,100; and 4,200; respectively.Indirect labor is $33,000.Other actual overhead costs totaled $36,000. Refer to Webb Company.What is the prime cost of Job #6? A) $42,250 B) $57,250 C) $73,250 D) $82,750 Direct material was requisitioned as follows for each job respectively: 30 percent,25 percent,and 25 percent; the balance of the requisitions was considered indirect.Direct labor hours per job are 2,500; 3,100; and 4,200; respectively.Indirect labor is $33,000.Other actual overhead costs totaled $36,000. Refer to Webb Company.What is the prime cost of Job #6?


A) $42,250
B) $57,250
C) $73,250
D) $82,750

Correct Answer

verifed

verified

Parker Company manufactures custom-built conveyor systems for factory and commercial operations.Susan Jones is the cost accountant for Parker Company and she is in the process of educating a new employee,Terry Smith about the job-order costing system that Parker Company uses.(The system is based on normal costs; overhead is applied based on direct labor cost and rounded to the next whole dollar.)The following job-order cost records are available for July: Parker Company manufactures custom-built conveyor systems for factory and commercial operations.Susan Jones is the cost accountant for Parker Company and she is in the process of educating a new employee,Terry Smith about the job-order costing system that Parker Company uses.(The system is based on normal costs; overhead is applied based on direct labor cost and rounded to the next whole dollar.)The following job-order cost records are available for July:    To explain the missing job number,Susan informed Terry that Job #668 had been completed in June.She also told her that Job #667 was the only job in process at the beginning of July.At that time,the job had been assigned $4,300 for direct material and $900 for direct labor.At the end of July,Job #671 had not been completed; all others had.Terry asked Susan several questions to determine whether she understood the job-order system. Required: Help Susan answer the following questions:         To explain the missing job number,Susan informed Terry that Job #668 had been completed in June.She also told her that Job #667 was the only job in process at the beginning of July.At that time,the job had been assigned $4,300 for direct material and $900 for direct labor.At the end of July,Job #671 had not been completed; all others had.Terry asked Susan several questions to determine whether she understood the job-order system. Required: Help Susan answer the following questions: Parker Company manufactures custom-built conveyor systems for factory and commercial operations.Susan Jones is the cost accountant for Parker Company and she is in the process of educating a new employee,Terry Smith about the job-order costing system that Parker Company uses.(The system is based on normal costs; overhead is applied based on direct labor cost and rounded to the next whole dollar.)The following job-order cost records are available for July:    To explain the missing job number,Susan informed Terry that Job #668 had been completed in June.She also told her that Job #667 was the only job in process at the beginning of July.At that time,the job had been assigned $4,300 for direct material and $900 for direct labor.At the end of July,Job #671 had not been completed; all others had.Terry asked Susan several questions to determine whether she understood the job-order system. Required: Help Susan answer the following questions:         Parker Company manufactures custom-built conveyor systems for factory and commercial operations.Susan Jones is the cost accountant for Parker Company and she is in the process of educating a new employee,Terry Smith about the job-order costing system that Parker Company uses.(The system is based on normal costs; overhead is applied based on direct labor cost and rounded to the next whole dollar.)The following job-order cost records are available for July:    To explain the missing job number,Susan informed Terry that Job #668 had been completed in June.She also told her that Job #667 was the only job in process at the beginning of July.At that time,the job had been assigned $4,300 for direct material and $900 for direct labor.At the end of July,Job #671 had not been completed; all others had.Terry asked Susan several questions to determine whether she understood the job-order system. Required: Help Susan answer the following questions:         Parker Company manufactures custom-built conveyor systems for factory and commercial operations.Susan Jones is the cost accountant for Parker Company and she is in the process of educating a new employee,Terry Smith about the job-order costing system that Parker Company uses.(The system is based on normal costs; overhead is applied based on direct labor cost and rounded to the next whole dollar.)The following job-order cost records are available for July:    To explain the missing job number,Susan informed Terry that Job #668 had been completed in June.She also told her that Job #667 was the only job in process at the beginning of July.At that time,the job had been assigned $4,300 for direct material and $900 for direct labor.At the end of July,Job #671 had not been completed; all others had.Terry asked Susan several questions to determine whether she understood the job-order system. Required: Help Susan answer the following questions:         Parker Company manufactures custom-built conveyor systems for factory and commercial operations.Susan Jones is the cost accountant for Parker Company and she is in the process of educating a new employee,Terry Smith about the job-order costing system that Parker Company uses.(The system is based on normal costs; overhead is applied based on direct labor cost and rounded to the next whole dollar.)The following job-order cost records are available for July:    To explain the missing job number,Susan informed Terry that Job #668 had been completed in June.She also told her that Job #667 was the only job in process at the beginning of July.At that time,the job had been assigned $4,300 for direct material and $900 for direct labor.At the end of July,Job #671 had not been completed; all others had.Terry asked Susan several questions to determine whether she understood the job-order system. Required: Help Susan answer the following questions:

Correct Answer

verifed

verified

Overapplied factory overhead that is material in amount is closed to cost of goods sold at year end.

Correct Answer

verifed

verified

Cayton Company. Cayton Company uses a job-order costing system and develops its predetermined overhead rate based on machine hours.The company has two jobs in process at the end of the cycle,Jobs #177 and #179. Cayton Company. Cayton Company uses a job-order costing system and develops its predetermined overhead rate based on machine hours.The company has two jobs in process at the end of the cycle,Jobs #177 and #179.    Refer to Cayton Company.What amount of overhead is charged to Jobs #177 and #179? Machine hours are split between Jobs #177 and #179-65 percent and 35 percent,respectively.Actual machine hours equal budgeted machine hours. Refer to Cayton Company.What amount of overhead is charged to Jobs #177 and #179? Machine hours are split between Jobs #177 and #179-65 percent and 35 percent,respectively.Actual machine hours equal budgeted machine hours.

Correct Answer

verifed

verified

OH Applied = MH Cost ยด POHR Jo...

View Answer

Miller Company Miller Company uses a job-order costing system.Assume that Job #504 is the only one in process.The following information is available: Miller Company Miller Company uses a job-order costing system.Assume that Job #504 is the only one in process.The following information is available:   Refer to Miller Company.What is the overhead application rate if Miller uses a predetermined overhead application rate based on direct labor hours (rounded to the nearest whole dollar) ? A) $ 0.20 B) $ 5.00 C) $ 5.38 D) $38.89 Refer to Miller Company.What is the overhead application rate if Miller uses a predetermined overhead application rate based on direct labor hours (rounded to the nearest whole dollar) ?


A) $ 0.20
B) $ 5.00
C) $ 5.38
D) $38.89

Correct Answer

verifed

verified

Webb Company. Webb Company uses a job-order costing system and the following information is available from its records.The company has three jobs in process: #6,#9,and #13. Webb Company. Webb Company uses a job-order costing system and the following information is available from its records.The company has three jobs in process: #6,#9,and #13.   Direct material was requisitioned as follows for each job respectively: 30 percent,25 percent,and 25 percent; the balance of the requisitions was considered indirect.Direct labor hours per job are 2,500; 3,100; and 4,200; respectively.Indirect labor is $33,000.Other actual overhead costs totaled $36,000. Refer to Webb Company.Assume the balance in Work in Process Inventory was $18,500 on June 1 and $25,297 on June 30.The balance on June 30 represents one job that contains direct material of $11,250.How many direct labor hours have been worked on this job (rounded to the nearest hour) ? A) 751 B) 1,324 C) 1,653 D) 2,976 Direct material was requisitioned as follows for each job respectively: 30 percent,25 percent,and 25 percent; the balance of the requisitions was considered indirect.Direct labor hours per job are 2,500; 3,100; and 4,200; respectively.Indirect labor is $33,000.Other actual overhead costs totaled $36,000. Refer to Webb Company.Assume the balance in Work in Process Inventory was $18,500 on June 1 and $25,297 on June 30.The balance on June 30 represents one job that contains direct material of $11,250.How many direct labor hours have been worked on this job (rounded to the nearest hour) ?


A) 751
B) 1,324
C) 1,653
D) 2,976

Correct Answer

verifed

verified

Bolles Corporation manufactures products on a job-order basis.The job cost sheet for Job #902 shows the following for April: Bolles Corporation manufactures products on a job-order basis.The job cost sheet for Job #902 shows the following for April:   At the end of April,what total cost appears on the job cost sheet for Job #902? A) $ 6,935 B) $ 6,985 C) $ 8,335 D) $10,015 At the end of April,what total cost appears on the job cost sheet for Job #902?


A) $ 6,935
B) $ 6,985
C) $ 8,335
D) $10,015

Correct Answer

verifed

verified

Which of the following could not be used in job-order costing?


A) standards
B) an average cost per unit for all jobs
C) normal costing
D) overhead allocation based on the job's direct labor hours

Correct Answer

verifed

verified

When manufacturing overhead is applied to a job in process,the ______________________________ account is debited

Correct Answer

verifed

verified

A company that manufactures custom bridal gowns will use a job-order costing system to track production costs.

Correct Answer

verifed

verified

When a job is begun,the first document in the job-order process is the ___________________________________.

Correct Answer

verifed

verified

materials ...

View Answer

A company that manufactures large quantities of homogeneous goods will normally use a ____________________ costing system.

Correct Answer

verifed

verified

A job-order costing system is likely to provide better A job-order costing system is likely to provide better     A) yes no no B) no yes yes C) no no no D) yes yes yes A job-order costing system is likely to provide better     A) yes no no B) no yes yes C) no no no D) yes yes yes


A) yes no no
B) no yes yes
C) no no no
D) yes yes yes

Correct Answer

verifed

verified

Products at Krause Manufacturing are sent through two production departments: Fabricating and Finishing.Overhead is applied to products in the Fabricating Department based on 150 percent of direct labor cost and $18 per machine hour in Finishing.The following information is available about Job #297: Products at Krause Manufacturing are sent through two production departments: Fabricating and Finishing.Overhead is applied to products in the Fabricating Department based on 150 percent of direct labor cost and $18 per machine hour in Finishing.The following information is available about Job #297:   What is the total cost of Job #297? A) $2,647 B) $3,005 C) $3,093 D) $3,203 What is the total cost of Job #297?


A) $2,647
B) $3,005
C) $3,093
D) $3,203

Correct Answer

verifed

verified

Webb Company. Webb Company uses a job-order costing system and the following information is available from its records.The company has three jobs in process: #6,#9,and #13. Webb Company. Webb Company uses a job-order costing system and the following information is available from its records.The company has three jobs in process: #6,#9,and #13.   Direct material was requisitioned as follows for each job respectively: 30 percent,25 percent,and 25 percent; the balance of the requisitions was considered indirect.Direct labor hours per job are 2,500; 3,100; and 4,200; respectively.Indirect labor is $33,000.Other actual overhead costs totaled $36,000. Refer to Webb Company.How much overhead is applied to Work in Process? A) $ 69,000 B) $ 99,960 C) $132,960 D) $144,000 Direct material was requisitioned as follows for each job respectively: 30 percent,25 percent,and 25 percent; the balance of the requisitions was considered indirect.Direct labor hours per job are 2,500; 3,100; and 4,200; respectively.Indirect labor is $33,000.Other actual overhead costs totaled $36,000. Refer to Webb Company.How much overhead is applied to Work in Process?


A) $ 69,000
B) $ 99,960
C) $132,960
D) $144,000

Correct Answer

verifed

verified

Cayton Company. Cayton Company uses a job-order costing system and develops its predetermined overhead rate based on machine hours.The company has two jobs in process at the end of the cycle,Jobs #177 and #179. Cayton Company. Cayton Company uses a job-order costing system and develops its predetermined overhead rate based on machine hours.The company has two jobs in process at the end of the cycle,Jobs #177 and #179.    Refer to Cayton Company.Fifty-four percent of raw material belongs to Job 17 and 38 percent belongs to Job 179,and the balance is considered indirect material.What amount of raw material used was allocated to overhead as indirect material? Refer to Cayton Company.Fifty-four percent of raw material belongs to Job 17 and 38 percent belongs to Job 179,and the balance is considered indirect material.What amount of raw material used was allocated to overhead as indirect material?

Correct Answer

verifed

verified

54% + 38% = 92%; thi...